Another weeks worth of work... Removed all the wires and injected the hold with epoxy. Sanded down the hull.
More work on the danggerboard trunk assembly, and glassed the bulkheads.
Installed the spacers and attached the two bulkheads together (these will be cut apart later).
Installed the main bulkheads. This is a big glue up job, but when pretty smoothly. Lots of prep but worth it so the glue up goes well.